06 August,2020
Published 06 August 2020 09:57

There are no violations of NPP safe operation limits and

conditions.

Radioactive situation meets established norms.

Systems of NPP physical protection work in normal

mode.

NPP security divisions and physical protection services

are on high alert.

 

 

Unit

Number

 

Unit status

 

Аverage dose rate on an industrial siteSv/h)

Zaporizhzhya NPP

1

In reserve until 07.08.2020

 

2

Power 675 MW (el.)

 

3

Power 980 MW (el.)

0,08

4

In outage till 01.09.2020

 

5

In outage till 14.11.2020

 

6

Power 985 MW (el.)

 

Rivno NPP

1

Power 420 MW (el.)

 

2

Power 395 MW (el.)

0,10

3

Power 975 MW (el.)

 

4

Power 995 MW (el.)

 

Khmelnitsky NPP

1

In outage till 09.08.2020

 

2

Power 830 MW (el.)

0,12

South Ukrainian NPP

1

In outage till 29.09.2020

 

2

Power 950 MW (el.)

0,11

3

Power 650 MW (el.)

 

Chornobyl NPP

Decommissioning

0,31

 

Performance indicator of NPP Units:

Zaporizhzhia NPP

Rivne NPP

Khmelnitsky NPP

South-Ukraine NPP

 

 

 


Outdated Browser
Для комфортної роботи в Мережі потрібен сучасний браузер. Тут можна знайти останні версії.
Outdated Browser
Цей сайт призначений для комп'ютерів, але
ви можете вільно користуватися ним.
67.15%
людей використовує
цей браузер
Google Chrome
Доступно для
  • Windows
  • Mac OS
  • Linux
9.6%
людей використовує
цей браузер
Mozilla Firefox
Доступно для
  • Windows
  • Mac OS
  • Linux
4.5%
людей використовує
цей браузер
Microsoft Edge
Доступно для
  • Windows
  • Mac OS
  • Linux
3.15%
людей використовує
цей браузер
Доступно для
  • Windows
  • Mac OS
  • Linux