There are no violations of NPP safe operation limits and conditions.
Radioactive situation meets established norms.
Systems of NPP physical protection work in normal mode.
NPP security divisions and physical protection services are on high alert.
Unit Number |
Unit status |
Аverage dose rate on an industrial site(µSv/h) |
Zaporizhzhya NPP |
||
1 |
Power 965 MW (el.) |
|
2 |
In outage till 11.11.2020 |
|
3 |
Power 1005 MW (el.) |
0,10 |
4 |
In outage till 20.10.2020 |
|
5 |
In outage till 14.11.2020 |
|
6 |
Power 1005 MW (el.) |
|
Rivno NPP |
||
1 |
Power 435 MW (el.) |
|
2 |
Power 425 MW (el.) |
0,10 |
3 |
Power 860 MW (el.) |
|
4 |
In outage till 09.01.2021 |
|
Khmelnitsky NPP |
||
1 |
Power 1010 MW (el.) |
|
2 |
In outage till 14.03.2021 |
0,12 |
South Ukrainian NPP |
||
1 |
Power 970 MW (el.) |
|
2 |
Power 990 MW (el.) |
0,12 |
3 |
Power 845 MW (el.) |
|
Chornobyl NPP |
||
Decommissioning |
0,29 |
Performance indicator of NPP Units: