There are no violations of NPP safe operation limits and conditions.
Radioactive situation meets established norms.
Systems of NPP physical protection work in normal mode.
NPP security divisions and physical protection services are on high alert.
Unit Number |
Unit status |
Аverage dose rate on an industrial site(µSv/h) |
Zaporizhzhya NPP |
||
1 |
Power 900 MW (el.) |
|
2 |
Power 1020 MW (el.) |
|
3 |
Power 1025 MW (el.) |
0,10 |
4 |
Power 1010 MW (el.) |
|
5 |
Disconnected from the power grid |
|
6 |
Power 1030 MW (el.) |
|
Rivno NPP |
||
1 |
Power 225 MW (el.) |
|
2 |
Power 430 MW (el.) |
0,10 |
3 |
Disconnected from the power grid |
|
4 |
Disconnected from the power grid |
|
Khmelnitsky NPP |
||
1 |
Power 1010 MW (el.) |
|
2 |
Disconnected from the power grid |
0,12 |
South Ukrainian NPP |
||
1 |
Power 1015 MW (el.) |
|
2 |
Power 1025 MW (el.) |
0,12 |
3 |
Power 600 MW (el.) |
|
Chornobyl NPP |
||
Decommissioning |
0,26 |
Performance indicator of NPP Units: