There are no violations of NPP safe operation limits and conditions.
Radioactive situation meets established norms.
Systems of NPP physical protection work in normal mode.
NPP security divisions and physical protection services are on high alert.
Unit Number | Unit status | On-site radiation level (µR/hour) |
Zaporizhzhya NPP | ||
1 | In outage till 30.12.14 | 11,0 |
2 | Power 1000 MW (el.) | |
3 | Power 1010 MW (el.) | |
4 | Power 1000 MW (el.) | |
5 | Power 1015 MW (el.) | |
6 | Power 1030 MW (el.) | |
Rivno NPP | ||
1 | Power 200 MW (el.) | 10,0 |
2 | Power 415 MW (el.) | |
3 | Power 1000 MW (el.) | |
4 | Power 1000 MW (el.) | |
South Ukrainian NPP | ||
1 | In outage till 06.11.14 | 12 |
2 | Power 1010 MW (el.) | |
3 | Power 1010 MW (el.) | |
| ||
1 | Power 600 MW (el.) | 12,0 |
2 | Power 1010 MW (el.) | |
Chornobyl NPP | ||
1 | Decommissioning | 190,0* |
2 | Decommissioning | |
3 | Decommissioning |
*Since 05.08.2014 the data for the radiation background on the site of the SSE “Chornobyl NPP” has being published based on the readings
of the nearest detectors of the Automatic Radiation Monitoring System (ASKRO) instead of the decommissioned system “RADOS”.