30 April, 2020
Published 30 April 2020 09:27
There are no violations of NPP safe operation limits and
conditions.
Radioactive situation meets established norms.
Systems of NPP physical protection work in normal
mode.
NPP security divisions and physical protection services
are on high alert.
Unit Number | Unit status | Аverage dose rate on an industrial site(µSv/h) |
Zaporizhzhya NPP | ||
1 | Power 985 MW (el.) | |
2 | In reserve until 20.05.2020 | |
3 | In outage till 09.05.2020 | 0,11 |
4 | Power 725 MW (el.) | |
5 | In outage till 14.11.2020 | |
6 | Power 1030 MW (el.) | |
Rivno NPP | ||
1 | Power 435 MW (el.) | |
2 | Power 415 MW (el.) | 0,10 |
3 | Power 710 MW (el.) | |
4 | Power 780 MW (el.) | |
| ||
1 | Power 1010 MW (el.) | |
2 | Power 800 MW (el.) | 0,12 |
South Ukrainian NPP | ||
1 | Power 800 MW (el.) | |
2 | In outage till 31.07.2020 | 0,11 |
3 | Power 600 MW (el.) | |
Chornobyl NPP | ||
Decommissioning | 0,31 |
Performance indicator of NPP Units: