29 November, 2013
Published 29 November 2013 05:52
Unit Number | Unit status | On-site radiation level (µR/hour) |
Zaporizhzhya NPP | ||
1 | Power 500 MW (el.) | 11,0 |
2 | Power 990 MW (el.) | |
3 | Power 340 MW (el.) | |
4 | Power 940 MW (el.) | |
5 | In outage till 15.12.13 | |
6 | Power 1020 MW (el.) | |
Rivno NPP | ||
1 | Power 0 MW (el.) | 9,0 |
2 | Power 420 MW (el.) | |
3 | Power 955 MW (el.) | |
4 | Power 490 MW (el.) | |
South Ukrainian NPP | ||
1 | In shutdown mode for preparation to life-time extension (repair, modernization and reconstruction), the license validity – 02.12.2013, 270 day of repairs | 12,1 |
2 | Power 1000 MW (el.) | |
3 | Power 1000 MW (el.) | |
| ||
1 | Power 1010 MW (el.) | 11,0 |
2 | Power 1010 MW (el.) | |
Chornobyl NPP | ||
1 | Decommissioning | 33,0 |
2 | Decommissioning | |
3 | Decommissioning |