29 April, 2018
Published 29 April 2018 07:44
There are no violations of NPP safe operation limits and conditions.
Radioactive situation meets established norms.
Systems of NPP physical protection work in normal mode.
NPP security divisions and physical protection services are on high alert.
Unit Number | Unit status | On-site radiation level (µR/hour) |
Zaporizhzhya NPP | ||
1 | Power 940 MW (el.) | |
2 | In outage till 13.05.18 | 11 |
3 | Power 1000 MW (el.) | |
4 | In outage till 26.10.18 | |
5 | Power 910 MW (el.) | |
6 | Power 1010 MW (el.) | |
Rivno NPP | ||
1 | Power 410 MW (el.) | |
2 | Power 405 MW (el.) | 10 |
3 | In outage till 23.07.18 | |
4 | Power 1000 MW (el.) | |
| ||
1 | In outage till 13.05.18 | |
2 | 12 | |
South Ukrainian NPP | ||
1 | Power 1020 MW (el.) | |
2 | In outage till 08.06.18 | 11,8 |
3 | In outage till 19.07.18 | |
Chornobyl NPP | ||
Decommissioning | 26 |