There are no violations of NPP safe operation limits and conditions.
Radioactive situation meets established norms.
Systems of NPP physical protection work in normal mode.
NPP security divisions and physical protection services are on high alert.
Unit Number | Unit status | On-site radiation level (µR/hour) |
Zaporizhzhya NPP | ||
1 | In outage till 30.11.17 | |
2 | Power 720 MW (el.) | 11 |
3 | Power 1015 MW (el.) | |
4 | Power 995 MW (el.) | |
5 | Power 1000 MW (el.) | |
6 | In outage till 17.01.18 | |
Rivno NPP | ||
1 | Power 430 MW (el.) | |
2 | Power 430 MW (el.) | 9 |
3 | Power 630 MW (el.) | |
4 | Power 1010 MW (el.) | |
Khmelnitsky NPP | ||
1 | In outage till 30.01.18 | |
2 | Power 1010 MW (el.) | 12 |
South Ukrainian NPP | ||
1 | Power 1020 MW (el.) | |
2 | Power 1020 MW (el.) | 11,7 |
3 | Power 1005 MW (el.) | |
Chornobyl NPP | ||
Decommissioning | 35 |