19 November, 2013
Published 19 November 2013 07:17
Unit Number | Unit status | On-site radiation level (µR/hour) |
Zaporizhzhya NPP | ||
1 | In outage till 27.11.13 | 11,0 |
2 | Power 995 MW (el.) | |
3 | Power 1000 MW (el.) | |
4 | Power 990 MW (el.) | |
5 | In outage till 15.12.13 | |
6 | Power 1015 MW (el.) | |
Rivno NPP | ||
1 | Power 0 MW (el.) | 10,0 |
2 | Power 420 MW (el.) | |
3 | Power 955 MW (el.) | |
4 | Power 490 MW (el.) | |
South Ukrainian NPP | ||
1 | In shutdown mode for preparation to life-time extension (repair, modernization and reconstruction), the license validity – 02.12.2013, 260 day of repairs | 11,8 |
2 | Power 1000 MW (el.) | |
3 | Power 1000 MW (el.) | |
| ||
1 | Power 1010 MW (el.) | 12,0 |
2 | Power 1010 MW (el.) | |
Chornobyl NPP | ||
1 | Decommissioning | 40,0 |
2 | Decommissioning | |
3 | Decommissioning |