19 April, 2016
Published 19 April 2016 07:24

There are no violations of NPP safe operation limits and conditions.

Radioactive situation meets established norms.

Systems of NPP physical protection work in normal mode.

NPP security divisions and physical protection services are on high alert.

 

 

Unit

Number

 

Unit status

 

On-site radiation levelR/hour)

Zaporizhzhya NPP

1

In outage till 25.05.16

11,0

2

In outage till 29.05.16

3

In outage till 05.07.16

4

Power 980 MW (el.)

5

Power 645 MW (el.)

6

Power 1015 MW (el.)

Rivno NPP

1

Power 420 MW (el.)

10,0

2

In outage till 04.06.16

3

Power 990 MW (el.)

4

Power 1005 MW (el.)

South Ukrainian NPP

1

Power 950 MW (el.)

12.6

2

Power 850 MW (el.)

3

In outage till 11.06.16

Khmelnitsky NPP

1

Power 1010 MW (el.)

12,0

2

Power 860 MW (el.)

Chornobyl NPP

1

Decommissioning

30,0

2

Decommissioning

3

Decommissioning

 

 


Outdated Browser
Для комфортної роботи в Мережі потрібен сучасний браузер. Тут можна знайти останні версії.
Outdated Browser
Цей сайт призначений для комп'ютерів, але
ви можете вільно користуватися ним.
67.15%
людей використовує
цей браузер
Google Chrome
Доступно для
  • Windows
  • Mac OS
  • Linux
9.6%
людей використовує
цей браузер
Mozilla Firefox
Доступно для
  • Windows
  • Mac OS
  • Linux
4.5%
людей використовує
цей браузер
Microsoft Edge
Доступно для
  • Windows
  • Mac OS
  • Linux
3.15%
людей використовує
цей браузер
Доступно для
  • Windows
  • Mac OS
  • Linux