18 May, 2015
Published 18 May 2015 08:52

 

There are no violations of NPP safe operation limits and conditions.

Radioactive situation meets established norms.

Systems of NPP physical protection work in normal mode.

NPP security divisions and physical protection services are on high alert.

 

 

Unit

Number

 

Unit status

 

On-site radiation levelR/hour)

Zaporizhzhya NPP

1

Power 960 MW (el.)

11,0

2

In outage till 29.05.15

3

In outage till 08.06.15

4

Power 850 MW (el.)

5

In outage till 12.06.15

6

Power 1000 MW (el.)

Rivno NPP

1

Power 360 MW (el.)

10,0

2

In outage till 28.05.15

3

Power 600 MW (el.)

4

Power 955 MW (el.)

South Ukrainian NPP

1

Power 890 MW (el.)

11,5

2

In outage till 17.12.15

3

Power 995 MW (el.)

Khmelnitsky NPP

1

Power 1000 MW (el.)

12,0

2

Power 810 MW (el.)

Chornobyl NPP

1

Decommissioning

191,0

2

Decommissioning

3

Decommissioning

 

 

 


Outdated Browser
Для комфортної роботи в Мережі потрібен сучасний браузер. Тут можна знайти останні версії.
Outdated Browser
Цей сайт призначений для комп'ютерів, але
ви можете вільно користуватися ним.
67.15%
людей використовує
цей браузер
Google Chrome
Доступно для
  • Windows
  • Mac OS
  • Linux
9.6%
людей використовує
цей браузер
Mozilla Firefox
Доступно для
  • Windows
  • Mac OS
  • Linux
4.5%
людей використовує
цей браузер
Microsoft Edge
Доступно для
  • Windows
  • Mac OS
  • Linux
3.15%
людей використовує
цей браузер
Доступно для
  • Windows
  • Mac OS
  • Linux