12 May, 2015
Published 12 May 2015 06:54

There are no violations of NPP safe operation limits and conditions.

Radioactive situation meets established norms.

Systems of NPP physical protection work in normal mode.

NPP security divisions and physical protection services are on high alert.

 

 

Unit

Number

 

Unit status

 

On-site radiation levelR/hour)

Zaporizhzhya NPP

1

Power 960 MW (el.)

11,0

2

In outage till 29.05.15

3

In outage till 08.06.15

4

Power 880 MW (el.)

5

In outage till 12.06.15

6

Power 1010 MW (el.)

Rivno NPP

1

Power 350 MW (el.)

10,0

2

In outage till 28.05.15

3

Power 605 MW (el.)

4

Power 935 MW (el.)

South Ukrainian NPP

1

Power 905 MW (el.)

11,8

2

In outage till 17.12.15

3

Power 995 MW (el.)

Khmelnitsky NPP

1

Power 1010 MW (el.)

12,0

2

Power 800 MW (el.)

Chornobyl NPP

1

Decommissioning

200,0

2

Decommissioning

3

Decommissioning

 

 

 


Outdated Browser
Для комфортної роботи в Мережі потрібен сучасний браузер. Тут можна знайти останні версії.
Outdated Browser
Цей сайт призначений для комп'ютерів, але
ви можете вільно користуватися ним.
67.15%
людей використовує
цей браузер
Google Chrome
Доступно для
  • Windows
  • Mac OS
  • Linux
9.6%
людей використовує
цей браузер
Mozilla Firefox
Доступно для
  • Windows
  • Mac OS
  • Linux
4.5%
людей використовує
цей браузер
Microsoft Edge
Доступно для
  • Windows
  • Mac OS
  • Linux
3.15%
людей використовує
цей браузер
Доступно для
  • Windows
  • Mac OS
  • Linux