12 April, 2020
Published 12 April 2020 09:51
Therearenoviolationsof NPP safe operation limits and
conditions.
Radioactive situation meets established norms.
Systems of NPP physical protection work in normal
mode.
NPP security divisions and physical protection services
are on high alert.
Unit Number | Unit status | Аverage dose rate on an industrial site(µSv/h) |
Zaporizhzhya NPP | ||
1 | Power 985 MW (el.) | |
2 | Power 870 MW (el.) | |
3 | In outage till 03.05.2020 | 0,11 |
4 | Power 870 MW (el.) | |
5 | Power 825 MW (el.) | |
6 | In outage till 14.04.2020 | |
Rivno NPP | ||
1 | Power 350 MW (el.) | |
2 | In outage till 28.04.2020 | 0,09 |
3 | Power 985 MW (el.) | |
4 | Power 970 MW (el.) | |
| ||
1 | Power 1010 MW (el.) | |
2 | Power 790 MW (el.) | 0,12 |
South Ukrainian NPP | ||
1 | In outage till 17.04.2020 | |
2 | Power 840 MW (el.) | 0,123 |
3 | Power 600 MW (el.) | |
Chornobyl NPP | ||
Decommissioning | 0,29 |
Performance indicator of NPP Units: