There are no violations of NPP safe operation limits and conditions.
Radioactive situation meets established norms.
Systems of NPP physical protection work in normal mode.
NPP security divisions and physical protection services are on high alert.
Unit Number | Unit status | On-site radiation level (µR/hour) |
Zaporizhzhya NPP | ||
| In outage till 30. | |
2 | Power 985 MW (el.) | |
3 | Power | |
4 | Power 995 MW (el.) | |
5 | Power | |
6 | Power | |
Rivno NPP | ||
| Power 320 MW (el.) | |
2 | Power 4 | |
3 | Power 980 MW (el.) | |
4 | Power 995 MW (el.) | |
South Ukrainian NPP | ||
| Power 985 MW (el.) | |
2 | Power | |
3 | Power 960 MW (el.) | |
| ||
| In outage till | |
2 | Power | |
Chornobyl NPP | ||
| Decommissioning | |
2 | Decommissioning | |
3 | Decommissioning |
*Since 05.08.20
of the nearest detectors of the Automatic Radiation Monitoring System (ASKRO) instead of the decommissioned system “RADOS”.