10 February, 2015
Published 10 February 2015 05:41

There are no violations of NPP safe operation limits and conditions.

Radioactive situation meets established norms.

Systems of NPP physical protection work in normal mode.

NPP security divisions and physical protection services are on high alert.

 

 

Unit

Number

 

Unit status

 

On-site radiation levelR/hour)

Zaporizhzhya NPP

1

Power 990 MW (el.)

11,0

2

In outage till 29.05.15

3

Power 1010 MW (el.)

4

Power 1000 MW (el.)

5

Power 550 MW (el.)

6

Power 1030 MW (el.)

Rivno NPP

1

In outage till 05.03.15

10,0

2

Power 420 MW (el.)

3

Power 985 MW (el.)

4

Power 1005 MW (el.)

South Ukrainian NPP

1

Power 985 MW (el.)

12,2

2

Power 1015 MW (el.)

3

In outage till 05.04.15

Khmelnitsky NPP

1

Power 1010 MW (el.)

12,0

2

Power 1010 MW (el.)

Chornobyl NPP

1

Decommissioning

190,0

2

Decommissioning

3

Decommissioning

 

 


Outdated Browser
Для комфортної роботи в Мережі потрібен сучасний браузер. Тут можна знайти останні версії.
Outdated Browser
Цей сайт призначений для комп'ютерів, але
ви можете вільно користуватися ним.
67.15%
людей використовує
цей браузер
Google Chrome
Доступно для
  • Windows
  • Mac OS
  • Linux
9.6%
людей використовує
цей браузер
Mozilla Firefox
Доступно для
  • Windows
  • Mac OS
  • Linux
4.5%
людей використовує
цей браузер
Microsoft Edge
Доступно для
  • Windows
  • Mac OS
  • Linux
3.15%
людей використовує
цей браузер
Доступно для
  • Windows
  • Mac OS
  • Linux