There are no violations of NPP safe operation limits and conditions.
Radioactive situation meets established norms.
Systems of NPP physical protection work in normal mode.
NPP security divisions and physical protection services are on high alert.
Unit Number | Unit status | On-site radiation level (µR/hour) |
Zaporizhzhya NPP | ||
1 | Power 770 MW (el.) | 11,0 |
2 | Power 600 MW (el.) | |
3 | In outage till 13.11.17 | |
4 | In outage till 24.09.17 | |
5 | Power 930 MW (el.) | |
6 | Power 960 MW (el.) | |
Rivno NPP | ||
1 | Power 410 MW (el.) | 10,0 |
2 | Power 410 MW (el.) | |
3 | Power 970 MW (el.) | |
4 | In outage till 25.08.17 | |
South Ukrainian NPP | ||
1 | In outage till 04.10.17 | 11,6 |
2 | Power 660 MW (el.) | |
3 | Power 955 MW (el.) | |
| ||
1 | Power 650 MW (el.) | 12,0 |
2 | Power 805 MW (el.) | |
Chornobyl NPP | ||
Decommissioning | 36,0 |