There are no violations of NPP safe operation limits and conditions.
Radioactive situation meets established norms.
Systems of NPP physical protection work in normal mode.
NPP security divisions and physical protection services are on high alert.
Unit Number | Unit status | Аverage dose rate on an industrial site (µSv/h) |
Zaporizhzhya NPP | ||
1 | Power 990 MW (el.) | |
2 | Power 770 MW (el.) | |
3 | In outage till 03.05.2020 | 0,11 |
4 | Power 920 MW (el.) | |
5 | Power 770 MW (el.) | |
6 | In outage till 14.04.2020 | |
Rivno NPP | ||
1 | Power 300 MW (el.) | |
2 | In outage till 28.04.2020 | 0,1 |
3 | Power 970 MW (el.) | |
4 | Power 860 MW (el.) | |
Khmelnitsky NPP | ||
1 | In outage till 17.04.2020 | |
2 | Power 1010 MW (el.) | 0,12 |
South Ukrainian NPP | ||
1 | Power 810 MW (el.) | |
2 | Power 890 MW (el.) | 0,114 |
3 | Power 600 MW (el.) | |
Chornobyl NPP | ||
Decommissioning | 0,32 |
Performance indicator of NPP Units: