There are no violations of NPP safe operation limits and conditions.
Radioactive situation meets established norms.
Systems of NPP physical protection work in normal mode.
NPP security divisions and physical protection services are on high alert.
Unit Number | Unit status | Аverage dose rate on an industrial site (µSv/h) |
Zaporizhzhya NPP | ||
1 | Power 990 MW (el.) | |
2 | Power 1030 MW (el.) | |
3 | In outage till 03.05.2020 | 0,11 |
4 | Power 1020 MW (el.) | |
5 | Power 1010 MW (el.) | |
6 | In outage till 14.04.2020 | |
Rivno NPP | ||
1 | Power 430 MW (el.) | |
2 | Power 415 MW (el.) | 0,09 |
3 | Power 995 MW (el.) | |
4 | Power 1015 MW (el.) | |
| ||
1 | In outage till 27.01.2020 | |
2 | Power 1010 MW (el.) | 0,12 |
South Ukrainian NPP | ||
1 | Power 1020 MW (el.) | |
2 | Power 1020 MW (el.) | 0,121 |
3 | In outage till before 24:00 05.01.2020 | |
Chornobyl NPP | ||
Decommissioning | 0,28 |
Performance indicator of NPP Units: