03 May, 3013
Published 03 May 2013 06:08
Unit Number | Unit status | On-site radiation level (µR/hour) |
Zaporizhzhya NPP | ||
1 | Power 950 MW (el.) | 11,0 |
2 | Power 570 MW (el.) | |
3 | In outage till 05.05.13 | |
4 | In outage till 25.05.13 | |
5 | Power 980 MW (el.) | |
6 | Power 1005 MW (el.) | |
Rivno NPP | ||
1 | Power 380 MW (el.) | 10,0 |
2 | In outage till 19.05.13 | |
3 | Power 850 MW (el.) | |
4 | In outage till 08.06.13 | |
South Ukrainian NPP | ||
1 | In shutdown mode for preparation to life-time extension (repair, modernization and reconstruction), the license validity – 02.12.2013, 60 day of repairs | 12,2 |
2 | Power 990 MW (el.) | |
3 | Power 610 MW (el.) | |
| ||
1 | Power 960 MW (el.) | 11,0 |
2 | Power 1010 MW (el.) | |
Chornobyl NPP | ||
1 | Decommissioning | 34,0 |
2 | Decommissioning | |
3 | Decommissioning |